Standard: ceiling tiles in suspended metal frame
Mineral fibre tiles
on suspended metal frame system
Typically
500mm Exposed concrete ceiling
Concrete soffit
plastered & painted if
required
The best opportunities for improving
materials resource efficiency in construction
projects occur during the design stage.
Implementing these opportunities can provide
significant cost savings, reductions in waste
disposed to landfill, and carbon reductions.
This sheet is part of a series highlighting
alternative design details which use less
materials or result in less waste being created
than ‘standard’ details used in construction.
The benefits provided by the alternative design
detail are quantified, and technical
considerations presented.
Potential benefits:
_ Typical cost savings of £18/m2.
_Major labour savings.
_ Up to 6 tonnes of materials saved
per 1000m2.
_Up to 100% embodied carbon saving for
ceiling finish.
قراءة و تحميل كتاب ادارة المشاريع الانشائيه و الاقتصاد الهندسى PDF مجانا